Assembly

Assemble in any of the following ways:
1 Hanging on a wall on brackets.
2 On the floor with a base frame.
3 On the floor with support legs.
4 Bottom connection.


Adjustment, cleaning
Use a measuring damper MLC or another
exterally filted damper for air flow adjustment.
The unit and duct system can be cleaned internally
by removing the unit from the ductwork.

Maintenance
Clean with water and a mild detergant solution.
    Bottom connection  
 

1 ) Mount the fastening bracket to the floor

2 ) Mount the LDO unit and connect do duct

3 ) Fasten LDO unit with screws to the bracket

4 ) NB! Duct ends 60mm above floor level

5 ) Recommended cut-out size=duct diameter + 5mm