Assembly etc.
A circular hole should be made in the floor. The lower part
of the unit is pushed in to the hole and fixed to the floor with screws.
The circular top is pushed on to the bottom part and fixed with screws
at the side.
Adjustment, cleaning
Airflow adjustment to be carried out with an external damper.(Not
incl.) The unit and ductwork can be cleaned internally by removing the
unit front panel.
Maintenance Clean with water and a mild detergent solution. |
|
We recommend that
the unit is fitted when all other building work is finished. |