Assembly etc.
A circular hole should be made in the floor. The lower part of the unit is pushed in to the hole and fixed to the floor with screws. The circular top is pushed on to the bottom part and fixed with screws at the side.

Adjustment, cleaning
Airflow adjustment to be carried out with an external damper.(Not incl.) The unit and ductwork can be cleaned internally by removing the unit front panel.

Maintenance
Clean with water and a mild detergent solution.

We recommend that the unit is fitted when all other
building work is finished.