Assembly etc.
Mounted in false ceiling shown below. |
|
|
|
Push the exhaust and plenum box together and fixate them in desired position with screw/pop-nut through holes inside the plenum box. |
|
Mount the unit in the false ceilings T-profile. Use pendulum or clamp. Holes for this are located in the plenum box. |
|
|
|
Calculate which k-factor that would be needed to give the stated air flow for the selected units. This makes the following commissioning easier. |
|
|
When the front is mounted in place it forms a flat surfaces with the ceiling. |